Home | About | Kitchen | Bathroom | Custom | Materials | Vendors | Reviews | Contact
Home | About | Kitchen | Bathroom | Custom | Materials | Vendors | Reviews | Contact
Clean bathroom vanity with dark wood double-sink cabinet, light granite countertop, large mirror, and white floral arrangement
(501) 658-6511
Tap to Call

Full-service countertop fabrication and installation — from custom measurements to final installation.

▼ Special Offers & Consultations ▼
Kitchen countertop sample swatch in warm neutral tones Bathroom vanity surface detail with subtle stone pattern Quartz countertop edge profile close-up Granite slab with natural mineral veining Outdoor kitchen stone countertop in sunlight

Installing a countertop with an integrated drainboard

An integrated drainboard countertop combines an undermount sink with a sloped, ribbed draining area cut into the same surface. Instead of sitting beside the bowl like a separate stainless insert, the drainboard directs water back toward the sink while keeping food preparation and washing in one compact zone. The result is visually continuous, easier to wipe clean and well suited to kitchens where every centimetre of bench space matters.

For Australian households, the idea is especially understandable in compact Sydney and Melbourne apartments, open-plan family kitchens and renovations centred on a 600 or 900 mm cabinet run. The Countertop Store serves North Little Rock, Arkansas, and nearby communities, but the craft behind the project is universal: accurate templates, skilled fabrication, careful plumbing coordination and a clean installation. The following process explains how one of these custom worktops is designed, built and fitted.

Planning the sink and drainboard

Planning begins with the way the kitchen will be used. The sink opening needs enough width and depth for large pots, while the drainboard must accommodate the dishes used most often without taking valuable preparation space. Many Australian kitchen plans use a sink bowl around 450–600 mm wide and a benchtop approximately 38–40 mm thick. Smaller bowls suit apartments, whereas a 600 mm bowl offers greater capacity in a family kitchen.

The drainboard is formed from rounded channels, shallow ribs or a continuous slope leading toward the sink. Its fall should move water cleanly into the bowl without leaving pools behind. The designer also establishes the drain outlet position, tap-hole locations, overflow choice, bowl depth and edge profile. A useful layout keeps these features clear of the main chopping zone and allows cabinet drawers to open without striking the bowl or plumbing.

Material affects every stage of the design. Homeowners can compare countertop material options before settling on quartz, granite, porcelain, marble, Dekton, soapstone or butcher block. Hard stone and sintered surfaces can carry finely machined grooves, although their density and brittleness require suitable tools. Wood or soapstone may need additional sealing around the sink. The Australian market offers many imported slabs, so colour selection, slab availability and freight can influence both the design choices and delivery schedule.

Taking accurate site measurements

Site measurement should occur after the base cabinets are installed, or once their final positions are certain. The template records the overall run, wall irregularities, internal and external corners, bench height and the exact cutouts for cooktops, sinks and service openings. Measurements are checked in several directions because a wall that looks straight from the front may taper toward the back. Existing splashbacks, uneven plasterwork and window reveals can all affect fabrication.

A digital template or physical pattern captures the sink opening and the outline of the drainboard area. The fabricator can then reproduce the curves and place the grooves accurately during machining. The countertop drawing should show the bowl dimensions, drain centre, tap holes, edge treatment and direction of any material pattern. Photos are useful for confirming details that do not appear clearly in the template, especially the position of outlets and plumbing.

Australian plans are commonly dimensioned in millimetres, while the Arkansas installation team records the site according to its fabrication requirements. Access must also be considered before a slab is ordered. A Sydney apartment may involve narrow corridors, a lift or a constrained loading area, and a regional property may require longer freight handling. Measurements taken in the field are therefore checked against the planned path from delivery point to kitchen before the custom worktop leaves the workshop.

Preparing the cabinet and plumbing

The cabinet beneath the sink must be rigid, level and capable of carrying the weight of stone. Installers check it from front to back and side to side, replacing packing pieces or uneven sections as required. The sink base should provide continuous support around the opening rather than relying on flexible rear panels. Drawers and hardware may need temporary removal so the countertop can be carried over the cabinet without force.

Plumbing is coordinated before installation begins. The waste outlet, trap, shut-off valves and supply connections must align with the positions shown on the fabrication drawing. An Australian renovation would normally involve a licensed plumber, with relevant wet-area waterproofing and standards considered where applicable. In Arkansas, the installation follows local plumbing and building requirements. Across both markets, early coordination prevents a correctly cut sink from being compromised by a waste pipe sitting outside its permitted centre points.

The surrounding wall and floor are protected before work starts. Cabinet tops are cleaned, gaps are checked and the installation area is kept clear of heavy tools that could strike the stone. Existing benchtop sections are removed carefully where they meet the new work. Measurements are repeated at this stage, particularly if cabinetry has shifted or walls have been disturbed during earlier demolition.

Fabricating the custom countertop

Fabrication starts with laying out the slab so the sink, drainboard and finished edges occupy the most practical positions. Stone with strong veining or movement is oriented to suit the kitchen rather than being placed solely for convenience. CNC machinery, waterjet cutting or specialist stone tools create the sink opening, drain hole, tap holes and any decorative recesses. Precision matters because these cuts cannot be widened once the countertop has been polished.

The bowl edges are finished to suit the chosen installation method, while the drainboard channels receive rounded bottoms and a consistent fall toward the sink. Reinforcement or a supported substructure may be added beneath a heavy cutout. The same process can shape a backsplash, matching edge detail or other surfaces, provided the design and access allow it. A seam may be necessary around unusually large bowls or when the drainboard reaches the end of the slab, but it should avoid crossing the deepest part of the sink.

Every component is inspected against the approved drawing before dispatch. The fabricator checks opening dimensions, hole positions, groove spacing, surface finish and edge consistency. Some adhesives or sealants need time to reach full strength, so the installer follows the specified curing schedule rather than connecting everything immediately. This controlled factory stage turns the measured design into a precise countertop with an integrated sink and functional draining surface.

Installing and testing the worktop

The finished countertop is unpacked as close to the kitchen as possible and checked for visible damage. Installers trial-fit the slab before applying adhesive, confirming that the walls, cabinet base and sink opening align. The worktop is lifted with suitable supports, temporary shims are placed beneath uneven areas, and the cabinet is adjusted until the surface sits securely. It should be supported evenly rather than twisted or forced against the wall.

For an undermount installation, silicone and mechanical clips secure the bowl to the underside of the countertop. Joints are aligned, seams are filled where required and excess adhesive is removed before it cures. The drainboard is inspected again under good lighting: water should travel toward the sink without catching in the grooves. Drawers and doors remain protected until the adhesive has reached the required strength.

The tap, waste fittings and plumbing connections are completed, followed by a full water test. The installer checks the drain, supply lines, overflow and sealed joints for leaks while water passes through the bowl and across the integrated drainboard. In Perth, hard water can expose poor sealing or leave mineral marks quickly, while humid conditions in Brisbane can make thorough drying and ventilation especially important. The countertop is cleaned with a material-safe product, and the final handover includes care instructions, approved finish details and confirmation that the bowl and draining area perform correctly.

Facebook social media icon
Houzz profile icon
Share this page:
Home About Kitchen Bathroom Custom Materials Vendors Reviews Contact
Serving North Little Rock, AR and surrounding areas — 14844 Ingram Rd, North Little Rock, AR 72113-9725
The Countertop Store © 2005–2025. All rights reserved.
Privacy Policy  |  Built by Vivial